ProjectBridge

Civil Estimator

The estimator's tool for heavy-civil work: takeoff in, priced bid out. Build quantities from a template, manual lines, a CSV paste, earthwork grids and cross-sections, materials conversions, and underground pipe runs — then close the bid with indirects, bond, and markup and get a report that foots to the cent.

ProjectBridge is a platform, not a construction company. This is an estimate built from the entered quantities and rates — not a quote. The contractor's signed bid is the real number.

v1 intake, plainly: quantities and surfaces enter via manual lines, a CSV file upload, CSV paste, grid entry, and cross-section entry. There is no native PDF or CAD parsing in this pass — export quantities from your takeoff program as CSV and upload the file (or paste it in section 2); phase, strata, and depth columns are preserved, never flattened.

Your account — saved projects & your cost library

The estimator works without an account, but nothing is saved when you close the page. With a free account, your projects and your private cost library are saved under your sign-in only — never shared, never shown to other accounts, never public. Your password is stored as a one-way scrambled hash, never in plain text.

1. Project & template

CSV is the working format: export the quantity schedule from AGTEK or your takeoff program as CSV and upload it here — the lines land in section 2, priced from the assemblies and ready to build. PDF and CAD (DWG/DXF) files can't be read directly yet: export the quantities as CSV from the program that made them and upload that instead.

p

2. Bid lines — manual entry, CSV upload, or CSV paste

One line per row: description, quantity, unit, assembly, phase, strata, depth_bracket, labor_rate, equipment_rate, material_rate — only the first three are required. Assemblies: custom, earthwork, pipe, structure, asphalt_paving, concrete, aggregate_base, erosion_control. A pipe line auto-expands into pipe + bedding + backfill + spoil, with the depth bracket driving the factors, crew, and production rate. Rates you enter override the seed library rates on custom lines.

3. Earthwork takeoff (Gradework-style)

Grid mode: paste existing and proposed elevation grids (rows on separate lines, values comma-separated, same size), or use cross-sections below. Cut, fill, strata, topsoil, subgrade, shrink/swell, and the borrow/spoil balance feed bid lines automatically.

4. Materials takeoff

One per line: type, description, area sq ft, length ft, count, thickness in, waste % — types: asphalt (→ tons), concrete / aggregate (→ CY), length (→ LF curb/guardrail), count (→ structures).

5. Underground — pipe runs

One run per line, structure to structure: id, from, to, length ft, pipe size in, material, depth ft, trench width ft (blank = pipe + 2 ft), bedding in, structures, fittings, valves, crossing id, invert elevation ft. Trench excavation, bedding, backfill, pipe displacement, and spoil are computed from the trench template; crossing runs at conflicting elevations are flagged.

6. Closing

See the job in 3D

You are looking at the finished ground. Red ground has to be dug out, blue ground has to be filled in, and plain ground is already about right.

Red = dig out (darker red = deeper dig) Blue = fill in (darker blue = deeper fill) Plain = already about right See-through skin = ground today

Drag to spin it. Scroll or pinch to zoom. Right-drag (or hold Shift and drag) to slide it around. Tap any spot on the ground to see how deep the dig or fill is there.

Tap “Load a sample job” to see a finished 3D job in one tap — a building pad, a pond, and a fill area — or enter your own grids in section 3 and tap “Draw my ground.”

Your bid report will appear here.