For a typical 3000 sq ft of space project at a mid finish level in the Jackson, Ohio area, the estimated range is $467,131 – $821,507.
Estimated range — not a quote. Your contractor's bid is the real number.
What drives the price
- Kitchen size and equipment package — the single biggest swing
- Grease interceptor, gas service and hood/fire-suppression requirements
- Health department and fire marshal review scope
- Dining room finish level and seating count
- Drive-thru, patio, or signage scope
Materials (typical project — ranges)
| Material | Quantity | Subtotal range |
|---|---|---|
| Framing & structural materials | 3300 sq ft | $32,060 – $40,804 |
| Insulation & drywall | 3300 sq ft | $29,388 – $37,404 |
| Electrical & lighting materials | 3300 sq ft | $53,434 – $68,006 |
| Plumbing & gas materials | 3300 sq ft | $42,747 – $54,405 |
| HVAC & kitchen ventilation materials | 3300 sq ft | $40,075 – $51,005 |
| Commercial kitchen equipment allowance | 1 packages | $121,440 – $154,560 |
| Hood & fire suppression set | 1 sets | $16,192 – $20,608 |
| Flooring (quarry tile / commercial) | 3300 sq ft | $32,060 – $40,804 |
| Ceiling system (grid & tile) | 3300 sq ft | $17,366 – $22,102 |
| Paint, doors & finishes | 3300 sq ft | $21,373 – $27,203 |
| Restroom package allowance | 1 packages | $12,144 – $15,456 |
Materials takeoff — what to order (typical project)
| Item | What's in it | Net quantity | Waste allowance | Order quantity |
|---|---|---|---|---|
| Framing & structural materials | Studs, plates & structural members — count at the planning rule of 1 stud per sq ft (16 in. o.c. incl. corners & plates) | 3000 sq ft | 15% (Framing lumber & studs) | 3450 sq ft 3450 pieces — studs & plates, 8-ft equivalents |
| Insulation & drywall | Insulation batts + drywall — sheet count is 4×8 sheets at 32 sq ft coverage per sheet | 3000 sq ft | 10% (Sheet goods (drywall, panels, decking)) | 3300 sq ft 104 sheets — drywall sheets (4×8) |
| Electrical & lighting materials | 3000 sq ft | 10% (General materials) | 3300 sq ft | |
| Plumbing & gas materials | 3000 sq ft | 10% (General materials) | 3300 sq ft | |
| HVAC & kitchen ventilation materials | 3000 sq ft | 10% (General materials) | 3300 sq ft | |
| Commercial kitchen equipment allowance | 1 packages | 0% (Fixtures, equipment & packages) | 1 packages | |
| Hood & fire suppression set | 1 sets | 0% (Fixtures, equipment & packages) | 1 sets | |
| Flooring (quarry tile / commercial) | 3000 sq ft | 15% (Tile & stone) | 3450 sq ft | |
| Ceiling system (grid & tile) | 3000 sq ft | 10% (Sheet goods (drywall, panels, decking)) | 3300 sq ft | |
| Paint, doors & finishes | 3000 sq ft | 10% (General materials) | 3300 sq ft | |
| Restroom package allowance | 1 packages | 0% (Fixtures, equipment & packages) | 1 packages |
Planning list only — it never changes the estimate price. Net is the quantity the job consumes; Order adds the waste allowance for the material class (the estimate breakdown quantities already include a flat 10% waste factor — this list re-derives net vs order by class, so nothing is counted twice). Counts (studs, sheets, bundles, rolls) use the standard planning conversions stated on each line; confirm counts against the actual plans before ordering.
Labor by trade (ranges & stated assumptions)
| Trade | Hours & crew | Local labor cost range | Subtotal range |
|---|---|---|---|
| Demo & disposal | 420 hrs · crew of 3 (assumption) | $29.27–$47.37/hr | $12,291 – $19,896 |
| Framing & carpentry | 960 hrs · crew of 3 (assumption) | $31.02–$48.32/hr | $29,782 – $46,386 |
| Electrical | 570 hrs · crew of 1 (assumption) | $31.92–$51.27/hr | $18,197 – $29,225 |
| Plumbing & gas | 600 hrs · crew of 1 (assumption) | $31.88–$53.66/hr | $19,127 – $32,198 |
| HVAC & kitchen ventilation | 390 hrs · crew of 2 (assumption) | $30.83–$49.8/hr | $12,023 – $19,422 |
| Insulation | 120 hrs · crew of 2 (assumption) | $29.11–$50.67/hr | $3,493 – $6,081 |
| Drywall hang & finish | 420 hrs · crew of 2 (assumption) | $31.34–$45.19/hr | $13,161 – $18,980 |
| Tile work | 240 hrs · crew of 1 (assumption) | $26.53–$37.3/hr | $6,368 – $8,951 |
| Flooring install | 240 hrs · crew of 2 (assumption) | $31.53–$46.4/hr | $7,567 – $11,135 |
| Paint & finish | 270 hrs · crew of 1 (assumption) | $28.04–$39.36/hr | $7,571 – $10,627 |
Trades this project needs, in order
- Demo & disposal
- Framing & carpentry
- Electrical — licensed pro
- Plumbing & gas — licensed pro
- HVAC & kitchen ventilation — licensed pro
- Insulation
- Drywall hang & finish
- Tile work
- Flooring install
- Paint & finish
Your own estimate is free. Want it as a document you can plan and compare bids with? The Project Plan ($49 one-time) — scope breakdown, budget worksheet, bid-comparison kit, and red-flag guide, built from your project's numbers — is offered the moment your estimate is ready.
ProjectBridge cost library (costlib v0.2) — our own cost database, built from public data (federal labor statistics and published cost benchmarks) and local price checks. Ranges only; not a quote.