ProjectBridge

How much does a restaurant build-out cost?

For a typical 3000 sq ft of space project at a mid finish level in the Jackson, Ohio area, the estimated range is $467,131 – $821,507.

Estimated range — not a quote. Your contractor's bid is the real number.

What drives the price

Materials (typical project — ranges)

MaterialQuantitySubtotal range
Framing & structural materials3300 sq ft$32,060 – $40,804
Insulation & drywall3300 sq ft$29,388 – $37,404
Electrical & lighting materials3300 sq ft$53,434 – $68,006
Plumbing & gas materials3300 sq ft$42,747 – $54,405
HVAC & kitchen ventilation materials3300 sq ft$40,075 – $51,005
Commercial kitchen equipment allowance1 packages$121,440 – $154,560
Hood & fire suppression set1 sets$16,192 – $20,608
Flooring (quarry tile / commercial)3300 sq ft$32,060 – $40,804
Ceiling system (grid & tile)3300 sq ft$17,366 – $22,102
Paint, doors & finishes3300 sq ft$21,373 – $27,203
Restroom package allowance1 packages$12,144 – $15,456

Materials takeoff — what to order (typical project)

ItemWhat's in itNet quantityWaste allowanceOrder quantity
Framing & structural materialsStuds, plates & structural members — count at the planning rule of 1 stud per sq ft (16 in. o.c. incl. corners & plates)3000 sq ft15% (Framing lumber & studs)3450 sq ft
3450 pieces — studs & plates, 8-ft equivalents
Insulation & drywallInsulation batts + drywall — sheet count is 4×8 sheets at 32 sq ft coverage per sheet3000 sq ft10% (Sheet goods (drywall, panels, decking))3300 sq ft
104 sheets — drywall sheets (4×8)
Electrical & lighting materials3000 sq ft10% (General materials)3300 sq ft
Plumbing & gas materials3000 sq ft10% (General materials)3300 sq ft
HVAC & kitchen ventilation materials3000 sq ft10% (General materials)3300 sq ft
Commercial kitchen equipment allowance1 packages0% (Fixtures, equipment & packages)1 packages
Hood & fire suppression set1 sets0% (Fixtures, equipment & packages)1 sets
Flooring (quarry tile / commercial)3000 sq ft15% (Tile & stone)3450 sq ft
Ceiling system (grid & tile)3000 sq ft10% (Sheet goods (drywall, panels, decking))3300 sq ft
Paint, doors & finishes3000 sq ft10% (General materials)3300 sq ft
Restroom package allowance1 packages0% (Fixtures, equipment & packages)1 packages

Planning list only — it never changes the estimate price. Net is the quantity the job consumes; Order adds the waste allowance for the material class (the estimate breakdown quantities already include a flat 10% waste factor — this list re-derives net vs order by class, so nothing is counted twice). Counts (studs, sheets, bundles, rolls) use the standard planning conversions stated on each line; confirm counts against the actual plans before ordering.

Labor by trade (ranges & stated assumptions)

TradeHours & crewLocal labor cost rangeSubtotal range
Demo & disposal420 hrs · crew of 3 (assumption)$29.27–$47.37/hr$12,291 – $19,896
Framing & carpentry960 hrs · crew of 3 (assumption)$31.02–$48.32/hr$29,782 – $46,386
Electrical570 hrs · crew of 1 (assumption)$31.92–$51.27/hr$18,197 – $29,225
Plumbing & gas600 hrs · crew of 1 (assumption)$31.88–$53.66/hr$19,127 – $32,198
HVAC & kitchen ventilation390 hrs · crew of 2 (assumption)$30.83–$49.8/hr$12,023 – $19,422
Insulation120 hrs · crew of 2 (assumption)$29.11–$50.67/hr$3,493 – $6,081
Drywall hang & finish420 hrs · crew of 2 (assumption)$31.34–$45.19/hr$13,161 – $18,980
Tile work240 hrs · crew of 1 (assumption)$26.53–$37.3/hr$6,368 – $8,951
Flooring install240 hrs · crew of 2 (assumption)$31.53–$46.4/hr$7,567 – $11,135
Paint & finish270 hrs · crew of 1 (assumption)$28.04–$39.36/hr$7,571 – $10,627

Trades this project needs, in order

  1. Demo & disposal
  2. Framing & carpentry
  3. Electrical — licensed pro
  4. Plumbing & gas — licensed pro
  5. HVAC & kitchen ventilation — licensed pro
  6. Insulation
  7. Drywall hang & finish
  8. Tile work
  9. Flooring install
  10. Paint & finish

Get your own estimate

Your own estimate is free. Want it as a document you can plan and compare bids with? The Project Plan ($49 one-time) — scope breakdown, budget worksheet, bid-comparison kit, and red-flag guide, built from your project's numbers — is offered the moment your estimate is ready.

ProjectBridge cost library (costlib v0.2) — our own cost database, built from public data (federal labor statistics and published cost benchmarks) and local price checks. Ranges only; not a quote.