How much does a new home build cost?
For a typical 1800 sq ft of living area project at a mid finish level in the Jackson, Ohio area, the estimated range is $296,054 – $520,648.
Estimated range — not a quote. Your contractor's bid is the real number.
What drives the price
- Land is NOT included — this estimate is the build only, on your lot
- Site work: clearing, grading, driveway, and utility runs to the lot
- Well & septic vs. public water & sewer
- Foundation: basement vs. crawlspace vs. slab
- Stories, roof complexity, and kitchen/bath finish level
Materials (typical project — ranges)
| Material | Quantity | Subtotal range |
|---|---|---|
| Foundation concrete & block | 1980 sq ft | $30,457 – $38,764 |
| Framing package | 1980 sq ft | $43,281 – $55,085 |
| Roofing package | 1980 sq ft | $20,839 – $26,522 |
| Siding & exterior trim | 1980 sq ft | $22,442 – $28,563 |
| Windows & exterior doors | 14.4 openings | $13,407 – $17,063 |
| Kitchen & bath package allowance | 1 packages | $25,907 – $32,973 |
| Insulation & drywall | 1980 sq ft | $17,633 – $22,442 |
| Electrical, plumbing & HVAC materials | 1980 sq ft | $35,266 – $44,884 |
| Flooring & interior trim | 1980 sq ft | $22,442 – $28,563 |
| Paint materials | 1980 sq ft | $4,008 – $5,100 |
Labor by trade (ranges & stated assumptions)
| Trade | Hours & crew | Local labor cost range | Subtotal range |
|---|---|---|---|
| Site work & excavation | 216 hrs · crew of 3 (assumption) | $34.67–$59.19/hr | $7,488 – $12,786 |
| Foundation masonry | 180 hrs · crew of 2 (assumption) | $36.51–$50.86/hr | $6,573 – $9,154 |
| Framing & exterior carpentry | 990 hrs · crew of 4 (assumption) | $31.02–$48.32/hr | $30,712 – $47,835 |
| Roofing | 180 hrs · crew of 3 (assumption) | $29.33–$40.28/hr | $5,279 – $7,250 |
| Electrical | 288 hrs · crew of 2 (assumption) | $31.92–$51.27/hr | $9,194 – $14,766 |
| Plumbing | 288 hrs · crew of 2 (assumption) | $31.88–$53.66/hr | $9,181 – $15,455 |
| HVAC | 216 hrs · crew of 2 (assumption) | $30.83–$49.8/hr | $6,659 – $10,757 |
| Insulation | 126 hrs · crew of 2 (assumption) | $29.11–$50.67/hr | $3,668 – $6,385 |
| Drywall hang & finish | 324 hrs · crew of 3 (assumption) | $31.34–$45.19/hr | $10,153 – $14,642 |
| Flooring install | 180 hrs · crew of 2 (assumption) | $31.53–$46.4/hr | $5,675 – $8,351 |
| Paint & finish | 198 hrs · crew of 2 (assumption) | $28.04–$39.36/hr | $5,552 – $7,793 |
| General labor & cleanup | 270 hrs · crew of 3 (assumption) | $29.27–$47.37/hr | $7,902 – $12,790 |
Trades this project needs, in order
- Site work & excavation
- Foundation masonry
- Framing & exterior carpentry
- Roofing
- Electrical — licensed pro
- Plumbing — licensed pro
- HVAC — licensed pro
- Insulation
- Drywall hang & finish
- Flooring install
- Paint & finish
- General labor & cleanup
Your own estimate is free. Want it as a document you can plan and compare bids with? The Project Plan ($49 one-time) — scope breakdown, budget worksheet, bid-comparison kit, and red-flag guide, built from your project's numbers — is offered the moment your estimate is ready.
ProjectBridge cost library (costlib v0.2) — our own cost database, built from public data (federal labor statistics and published cost benchmarks) and local price checks. Ranges only; not a quote.