How much does a commercial flat roofing cost?

For a typical 5000 sq ft of roof area project at a mid finish level in the Jackson, Ohio area, the estimated range is $26,635 – $46,841.

Estimated range — not a quote. Your contractor's bid is the real number.

What drives the price

Materials (typical project — ranges)

MaterialQuantitySubtotal range
TPO / EPDM membrane system5500 sq ft$11,577 – $14,735
Insulation board & cover board5500 sq ft$6,234 – $7,934
Flashing, curbs & edge metal5500 sq ft$3,785 – $4,817
Fasteners, adhesives & sealants5500 sq ft$2,226 – $2,834
Roof drains & scupper allowance1 sets$1,295 – $1,649

Materials takeoff — what to order (typical project)

ItemWhat's in itNet quantityWaste allowanceOrder quantity
TPO / EPDM membrane systemMembrane in 10 ft × 100 ft rolls (1,000 sq ft per roll)5000 sq ft10% (Roofing materials)5500 sq ft
6 rolls — membrane rolls (10×100)
Insulation board & cover board5000 sq ft10% (Insulation)5500 sq ft
Flashing, curbs & edge metal5000 sq ft10% (Roofing materials)5500 sq ft
Fasteners, adhesives & sealants5000 sq ft10% (General materials)5500 sq ft
Roof drains & scupper allowance1 sets0% (Fixtures, equipment & packages)1 sets

Planning list only — it never changes the estimate price. Net is the quantity the job consumes; Order adds the waste allowance for the material class (the estimate breakdown quantities already include a flat 10% waste factor — this list re-derives net vs order by class, so nothing is counted twice). Counts (studs, sheets, bundles, rolls) use the standard planning conversions stated on each line; confirm counts against the actual plans before ordering.

Labor by trade (ranges & stated assumptions)

TradeHours & crewLocal labor cost rangeSubtotal range
Tear-off & disposal70 hrs · crew of 3 (assumption)$29.27–$47.37/hr$2,049 – $3,316
Membrane installation120 hrs · crew of 3 (assumption)$29.33–$40.28/hr$3,520 – $4,833
Deck, curb & edge repair25 hrs · crew of 2 (assumption)$31.02–$48.32/hr$776 – $1,208

Trades this project needs, in order

  1. Tear-off & disposal
  2. Membrane installation
  3. Deck, curb & edge repair

Get your own estimate

Your own estimate is free. Want it as a document you can plan and compare bids with? The Project Plan ($49 one-time) — scope breakdown, budget worksheet, bid-comparison kit, and red-flag guide, built from your project's numbers — is offered the moment your estimate is ready.

ProjectBridge cost library (costlib v0.2) — our own cost database, built from public data (federal labor statistics and published cost benchmarks) and local price checks. Ranges only; not a quote.