How much does a commercial build-out / tenant improvement cost?

For a typical 2500 sq ft of space project at a mid finish level in the Jackson, Ohio area, the estimated range is $263,448 – $463,306.

Estimated range — not a quote. Your contractor's bid is the real number.

What drives the price

Materials (typical project — ranges)

MaterialQuantitySubtotal range
Framing & structural materials2750 sq ft$26,717 – $34,003
Insulation & drywall2750 sq ft$24,490 – $31,170
Electrical & lighting materials2750 sq ft$42,302 – $53,838
Plumbing materials2750 sq ft$20,038 – $25,502
HVAC materials & ductwork2750 sq ft$28,943 – $36,837
Flooring (commercial)2750 sq ft$22,264 – $28,336
Ceiling system (grid & tile)2750 sq ft$14,472 – $18,418
Paint, doors & hardware2750 sq ft$17,811 – $22,669
Restroom package allowance1 packages$11,334 – $14,426

Materials takeoff — what to order (typical project)

ItemWhat's in itNet quantityWaste allowanceOrder quantity
Framing & structural materialsStuds, plates & structural members — count at the planning rule of 1 stud per sq ft (16 in. o.c. incl. corners & plates)2500 sq ft15% (Framing lumber & studs)2875 sq ft
2875 pieces — studs & plates, 8-ft equivalents
Insulation & drywallInsulation batts + drywall — sheet count is 4×8 sheets at 32 sq ft coverage per sheet2500 sq ft10% (Sheet goods (drywall, panels, decking))2750 sq ft
86 sheets — drywall sheets (4×8)
Electrical & lighting materials2500 sq ft10% (General materials)2750 sq ft
Plumbing materials2500 sq ft10% (General materials)2750 sq ft
HVAC materials & ductwork2500 sq ft10% (General materials)2750 sq ft
Flooring (commercial)2500 sq ft10% (Flooring)2750 sq ft
Ceiling system (grid & tile)2500 sq ft10% (Sheet goods (drywall, panels, decking))2750 sq ft
Paint, doors & hardware2500 sq ft10% (General materials)2750 sq ft
Restroom package allowance1 packages0% (Fixtures, equipment & packages)1 packages

Planning list only — it never changes the estimate price. Net is the quantity the job consumes; Order adds the waste allowance for the material class (the estimate breakdown quantities already include a flat 10% waste factor — this list re-derives net vs order by class, so nothing is counted twice). Counts (studs, sheets, bundles, rolls) use the standard planning conversions stated on each line; confirm counts against the actual plans before ordering.

Labor by trade (ranges & stated assumptions)

TradeHours & crewLocal labor cost rangeSubtotal range
Demo & disposal375 hrs · crew of 3 (assumption)$29.27–$47.37/hr$10,974 – $17,764
Framing & carpentry850 hrs · crew of 3 (assumption)$31.02–$48.32/hr$26,369 – $41,071
Electrical425 hrs · crew of 1 (assumption)$31.92–$51.27/hr$13,568 – $21,790
Plumbing250 hrs · crew of 1 (assumption)$31.88–$53.66/hr$7,970 – $13,416
HVAC work225 hrs · crew of 2 (assumption)$30.83–$49.8/hr$6,937 – $11,205
Insulation100 hrs · crew of 2 (assumption)$29.11–$50.67/hr$2,911 – $5,067
Drywall hang & finish375 hrs · crew of 2 (assumption)$31.34–$45.19/hr$11,751 – $16,946
Tile work75 hrs · crew of 1 (assumption)$26.53–$37.3/hr$1,990 – $2,797
Flooring install250 hrs · crew of 2 (assumption)$31.53–$46.4/hr$7,882 – $11,599
Paint & finish250 hrs · crew of 1 (assumption)$28.04–$39.36/hr$7,010 – $9,839

Trades this project needs, in order

  1. Demo & disposal
  2. Framing & carpentry
  3. Electrical — licensed pro
  4. Plumbing — licensed pro
  5. HVAC work — licensed pro
  6. Insulation
  7. Drywall hang & finish
  8. Tile work
  9. Flooring install
  10. Paint & finish

Get your own estimate

Your own estimate is free. Want it as a document you can plan and compare bids with? The Project Plan ($49 one-time) — scope breakdown, budget worksheet, bid-comparison kit, and red-flag guide, built from your project's numbers — is offered the moment your estimate is ready.