How much does a commercial build-out / tenant improvement cost?
For a typical 2500 sq ft of space project at a mid finish level in the Jackson, Ohio area, the estimated range is $263,448 – $463,306.
Estimated range — not a quote. Your contractor's bid is the real number.
What drives the price
- How much of the existing space is demolished and rebuilt
- Restroom count and plumbing runs from the building core
- Electrical service and lighting scope (retail and office differ sharply)
- HVAC: reusing the building system vs. new rooftop units
- Landlord work letter vs. tenant scope — who pays for what
Materials (typical project — ranges)
| Material | Quantity | Subtotal range |
|---|---|---|
| Framing & structural materials | 2750 sq ft | $26,717 – $34,003 |
| Insulation & drywall | 2750 sq ft | $24,490 – $31,170 |
| Electrical & lighting materials | 2750 sq ft | $42,302 – $53,838 |
| Plumbing materials | 2750 sq ft | $20,038 – $25,502 |
| HVAC materials & ductwork | 2750 sq ft | $28,943 – $36,837 |
| Flooring (commercial) | 2750 sq ft | $22,264 – $28,336 |
| Ceiling system (grid & tile) | 2750 sq ft | $14,472 – $18,418 |
| Paint, doors & hardware | 2750 sq ft | $17,811 – $22,669 |
| Restroom package allowance | 1 packages | $11,334 – $14,426 |
Materials takeoff — what to order (typical project)
| Item | What's in it | Net quantity | Waste allowance | Order quantity |
|---|---|---|---|---|
| Framing & structural materials | Studs, plates & structural members — count at the planning rule of 1 stud per sq ft (16 in. o.c. incl. corners & plates) | 2500 sq ft | 15% (Framing lumber & studs) | 2875 sq ft 2875 pieces — studs & plates, 8-ft equivalents |
| Insulation & drywall | Insulation batts + drywall — sheet count is 4×8 sheets at 32 sq ft coverage per sheet | 2500 sq ft | 10% (Sheet goods (drywall, panels, decking)) | 2750 sq ft 86 sheets — drywall sheets (4×8) |
| Electrical & lighting materials | 2500 sq ft | 10% (General materials) | 2750 sq ft | |
| Plumbing materials | 2500 sq ft | 10% (General materials) | 2750 sq ft | |
| HVAC materials & ductwork | 2500 sq ft | 10% (General materials) | 2750 sq ft | |
| Flooring (commercial) | 2500 sq ft | 10% (Flooring) | 2750 sq ft | |
| Ceiling system (grid & tile) | 2500 sq ft | 10% (Sheet goods (drywall, panels, decking)) | 2750 sq ft | |
| Paint, doors & hardware | 2500 sq ft | 10% (General materials) | 2750 sq ft | |
| Restroom package allowance | 1 packages | 0% (Fixtures, equipment & packages) | 1 packages |
Planning list only — it never changes the estimate price. Net is the quantity the job consumes; Order adds the waste allowance for the material class (the estimate breakdown quantities already include a flat 10% waste factor — this list re-derives net vs order by class, so nothing is counted twice). Counts (studs, sheets, bundles, rolls) use the standard planning conversions stated on each line; confirm counts against the actual plans before ordering.
Labor by trade (ranges & stated assumptions)
| Trade | Hours & crew | Local labor cost range | Subtotal range |
|---|---|---|---|
| Demo & disposal | 375 hrs · crew of 3 (assumption) | $29.27–$47.37/hr | $10,974 – $17,764 |
| Framing & carpentry | 850 hrs · crew of 3 (assumption) | $31.02–$48.32/hr | $26,369 – $41,071 |
| Electrical | 425 hrs · crew of 1 (assumption) | $31.92–$51.27/hr | $13,568 – $21,790 |
| Plumbing | 250 hrs · crew of 1 (assumption) | $31.88–$53.66/hr | $7,970 – $13,416 |
| HVAC work | 225 hrs · crew of 2 (assumption) | $30.83–$49.8/hr | $6,937 – $11,205 |
| Insulation | 100 hrs · crew of 2 (assumption) | $29.11–$50.67/hr | $2,911 – $5,067 |
| Drywall hang & finish | 375 hrs · crew of 2 (assumption) | $31.34–$45.19/hr | $11,751 – $16,946 |
| Tile work | 75 hrs · crew of 1 (assumption) | $26.53–$37.3/hr | $1,990 – $2,797 |
| Flooring install | 250 hrs · crew of 2 (assumption) | $31.53–$46.4/hr | $7,882 – $11,599 |
| Paint & finish | 250 hrs · crew of 1 (assumption) | $28.04–$39.36/hr | $7,010 – $9,839 |
Trades this project needs, in order
- Demo & disposal
- Framing & carpentry
- Electrical — licensed pro
- Plumbing — licensed pro
- HVAC work — licensed pro
- Insulation
- Drywall hang & finish
- Tile work
- Flooring install
- Paint & finish
Your own estimate is free. Want it as a document you can plan and compare bids with? The Project Plan ($49 one-time) — scope breakdown, budget worksheet, bid-comparison kit, and red-flag guide, built from your project's numbers — is offered the moment your estimate is ready.
ProjectBridge cost library (costlib v0.2) — our own cost database, built from public data (federal labor statistics and published cost benchmarks) and local price checks. Ranges only; not a quote.